Author

admin

Browsing

The US is among the world’s top silver producers, recording output of 1,100 metric tons in 2024.

While that’s far below first-place Mexico’s production of 6,300 metric tons of silver, the US is still a major producer of the precious metal, and is likely to remain a key source moving forward. However, few mines in the US are primary silver producers — much of the silver in the country is produced as a by-product of gold mining, and it can also be found with metals like copper and zinc.

So where exactly is silver produced in the US, and which companies are mining it? Alaska is the leading silver-producing state, followed by Nevada and Idaho. America’s three largest primary silver mines by production are the Greens Creek mine in Idaho, the Rochester mine in Nevada and the Lucky Friday mine in Alaska.

Read on for an overview of the three largest US silver producers by market cap.

Data for the stocks listed was current as of January 15, 2026.

1. Hecla Mining Company (NYSE:HL)

Market cap: US$16.91 billion

Hecla Mining operates the Greens Creek and Lucky Friday silver mines in Alaska and Idaho. Greens Creek is the United State’s largest silver mine. In addition to being a major silver miner in the US, Hecla also has mines in Canada, with the Keno Hill silver operation in the Yukon Territory and Casa Berardi gold-silver mine in Québec. Additionally, Hecla has a variety of exploration projects across North America.

In its 2024 results, Hecla reported silver reserves of 240 million ounces, silver production of 16.2 million ounces and a record US$929.9 million in total sales. The majority of Hecla’s 2024 silver production was derived from its Greens Creek and Lucky Friday mines, which produced 8.48 and 4.89 million ounces respectively.

Hecla’s 2025 production guidance stands at 16.2 million to 17 million ounces, with the vast majority expected to come from its US operations. In Q3 2025, the company produced 4.59 million ounces of silver, and 13.22 million ounces through the first nine months of the year.

‘Our third quarter results represent a defining moment for Hecla, with record-breaking performance across a number of key financial metrics,’ Rob Krcmarov, Hecla’s president and CEO, said in its Q3 results. ‘Greens Creek continues to exceed expectations, Keno Hill has delivered three consecutive quarters of profitability under our ownership, Lucky Friday maintained consistent production while advancing the surface cooling project, and Casa Berardi’s cost trajectory is improving.’

2. Coeur Mining (NYSE:CDE)

Market cap: US$13.58 billion

Coeur Mining describes itself as a growing precious metals producer with four producing mines in the Americas. Its major silver-producing operation in the US is the Rochester silver-gold mine in Nevada. Its other US mines are the Kensington gold mine in Alaska and Wharf gold mine in South Dakota, with Wharf also producing silver as a by-product.

In Mexico, Couer owns the Palmarejo silver-gold complex in Chihuahua and the Las Chispas silver-gold mine in Sonora. Coeur added Las Chispas to its portfolio when it acquired SilverCrest in early 2025. Coeur is also advancing work at its Silvertip silver-zinc-lead project in British Columbia, Canada.

For 2024, Rochester’s silver production totaled 4.38 million ounces, falling slightly shy of its 2024 guidance of 4.8 million to 6.6 million ounces, while Coeur’s full silver production across its operations totaled 11.4 million ounces.

As of Q3 2025, Coeur’s 2025 silver production guidance stood at 18.1 million ounces, with Rochester expected to produce 6 million to 6.7 million ounces of silver. In the first nine months of the year, Coeur produced 13.2 million ounces of silver across its operations, with Rochester accounting for 4.38 million ounces.

“Coeur delivered another quarter of record financial results, driven by higher prices, balanced contributions from all five of our North American gold and silver operations along with overall strong cost control,” President and CEO Mitchell J. Krebs said in the release. “Las Chispas experienced a particularly strong quarter, with the team continuing to exceed expectations in just its second full quarter of operations with the Company.”

3. Americas Gold and Silver (NYSEAMERICAN:USAS)

Market cap: C$1.69 billion

Americas Gold and Silver is mining for silver in the US and Mexico. The company has two producing assets: the Galena Complex in Idaho, which produces silver, copper and antimony, and the Cosalá operation in Mexico. It also owns the Relief Canyon mine in Nevada, currently on care and maintenance, and the newly acquired, past-producing Crescent silver mine, located 9 miles from Galena in Idaho.

In December 2024, the company consolidated full ownership of Galena when it acquired the outstanding 40 percent interest from an affiliate of Eric Sprott and Paul Andre Huet. As part of the deal, Sprott acquired a significant interest in the company, and Huet was appointed its CEO and Chairman. Americas stated that its benefits from 100 percent ownership in the property include streamlined decision making and a focused vision for Galena.

The company has been working on expansion efforts at Galena since early 2024. In its 2024 results, Americas Gold and Silver reported attributable silver production from Galena of approximately 1.5 million ounces compared to 1.6 million ounces the previous year.

In September 2025, Americas completed the first upgrade on Galena’s No 3 shaft ahead of schedule, improving productivity. In its Q3 results, the company reported 2025 year-to-date production of 1.9 million ounces of silver.

In December, the company completed the acquisition of the past-producing Crescent silver mine near Galena. The historic resource at the site demonstrates mineralization similar to that at Galena, with the potential to add 1.4 million to 1.6 million ounces of silver annually.

In an operational update in January 2026, the company said development of Crescent was progressing rapidly and it was aiming for a mid-2026 restart of operations.

“This rapid execution is an excellent start to our plan to establish best-in-class operations at Crescent. We’re poised to unlock multiple synergies with our neighbouring Galena Complex from procurement savings and equipment sharing to G&A efficiencies and spare processing capacity,’ Chairman and CEO Huet stated.

Securities Disclosure: I, Dean Belder, currently hold a small investment in Hecla Mining, but do not hold investments in any other company mentioned in this article.

This post appeared first on investingnews.com

Apollo Silver Corp. (‘Apollo Silver’ or the ‘Company’) (TSX.V:APGO, OTCQB:APGOF, Frankfurt:6ZF0) is pleased to announce that it has closed the first tranche of its previously announced upsized non-brokered private placement (the ‘Offering’) and has issued an aggregate of 3,000,000 units (the ‘Units’) at a price of $5.00 per Unit for aggregate gross proceeds of $15,000,000.

As previously announced, Eric Sprott, one of Apollo Silver’s largest shareholders, participated in the first tranche and subscribed for 2,500,000 Units, for gross proceeds of $12,500,000. The first tranche also included participation from Apollo Silver insiders, including certain directors and officers of the Company.

Eric Sprott, through 2176423 Ontario Ltd., a corporation beneficially owned by him, acquired 2,500,000 Units pursuant to the first tranche of the Offering for total consideration of $12,500,000. Prior to the Offering, Mr. Sprott beneficially owned and controlled 3,688,889 Shares and 1,388,889 Warrants, representing approximately 6.5% of the outstanding Shares on a non-diluted basis and 8.7% of the outstanding Shares on a partially-diluted basis assuming exercise of such Warrants.

As a result of closing the first tranche of the Offering, Mr. Sprott now beneficially owns and controls 6,188,889 Shares and 3,888,889 Warrants, representing approximately 10.3% of the outstanding Shares on a non-diluted basis and 15.8% of the outstanding Shares on a partially-diluted basis assuming exercise of such Warrants. The securities are held for investment purposes.

Mr. Sprott has a long-term view of the investment and may acquire additional securities including on the open market or through private acquisitions or sell the securities including on the open market or through private dispositions in the future depending on market conditions, reformulation of plans and/or other relevant factors.

A copy of the early warning report with respect to the foregoing will appear on Apollo Silver’s profile on SEDAR+ at www.sedarplus.ca and may also be obtained by calling Mr. Sprott’s office at (416) 945-3294 (2176423 Ontario Ltd., 7 King Street East, Suite 1106, Toronto Ontario M5C 3C5).

The first tranche of the Offering included participation by certain insiders of the Company for an aggregate of 471,000 Units totaling gross proceeds of $2,355,000. Such participation constitutes a ‘related party transaction’ under Multilateral Instrument 61-101 – Protection of Minority Security Holders in Special Transactions (‘MI 61-101’). The issuance of securities to insiders is exempt from the valuation requirement pursuant to section 5.5(b) of MI 61-101, as the Company’s shares are not listed on a specified market, and from the minority shareholder approval requirement pursuant to section 5.7(a) of MI 61-101, as the fair market value of the securities issued to related parties does not exceed twenty five percent of the Company’s market capitalization.

A fund managed by Jupiter Asset Management has subscribed for Units under the Offering, which are expected to be issued in a subsequent and final tranche upon receipt of, and subject to, the completion of additional regulatory submissions and acceptance by the TSX Venture Exchange (‘TSXV’). The first tranche of the Offering remains subject to final approval of the TSXV.

‘The participation of a key shareholder and Apollo Silver insiders reflects strong alignment around the strategic value of primary silver assets in tightening silver markets,’ said Ross McElroy, President and CEO of Apollo Silver. ‘This financing further reinforces our positioning as a silver-focused company advancing large-scale assets in stable jurisdictions.’  

Each Unit issued pursuant to the Offering consists of one common share (a ‘Share’) in the capital of the Company and one common Share purchase warrant (a ‘Warrant’). Each Warrant entitles the holder thereof to purchase one Share at an exercise price of $7.00 for a period of 24 months from the closing date of the Offering.

In connection with subscriptions received in the first tranche of the Offering, the Company paid aggregate finder’s fees totaling $312,500, consisting of 62,500 Units issued to Research Capital Corporation on the same terms as the Units issued under the Offering, except that the Warrants comprising such Units are non-transferable.

The securities issued under the first tranche of the Offering are subject to a four-month hold period from the date of closing. The Company intends to use the net proceeds from the Offering to continue advancing the Calico Silver Project in San Bernardino, California; support community relations initiatives at the Cinco de Mayo Silver Project in Chihuahua, Mexico; cover ongoing property maintenance costs at both projects; and for general corporate purposes. The Offering remains subject to the final acceptance of the TSXV.

The Shares have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the ‘U.S. Securities Act’), or any U.S. state securities laws, and may not be offered or sold in the United States without registration under the U.S. Securities Act and all applicable state securities laws or compliance with the requirements of an applicable exemption therefrom. This news release shall not constitute an offer to sell or the solicitation of an offer to buy securities in the United States, nor shall there be any sale of these securities in any jurisdiction in which such offer, solicitation or sale would be unlawful.

About Apollo Silver Corp.

Apollo Silver is advancing one of the largest undeveloped primary silver projects in the US. The Calico project hosts a large, bulk minable silver deposit with significant barite and zinc credits – recognized as critical minerals essential to the US energy and medical sectors. The Company also holds an option on the Cinco de Mayo Project in Chihuahua, Mexico, which is host to a major carbonate replacement (CRD) deposit that is both high-grade and large tonnage. Led by an experienced and award-winning management team, Apollo Silver is well positioned to advance the assets and deliver value through exploration and development.

Please visit www.apollosilver.com for further information.

ON BEHALF OF THE BOARD OF DIRECTORS

Ross McElroy
President and CEO

For further information, please contact:

Email: info@apollosilver.com

Telephone: +1 (604) 428-6128

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement Regarding ‘Forward-Looking’ Information

This news release includes ‘forward-looking statements’ and ‘forward-looking information’ within the meaning of Canadian securities legislation. All statements included in this news release, other than statements of historical fact, are forward-looking statements including, without limitation, statements with respect to the expected timing and receipt of final approval of the first tranche of the Offering, the expected timing and receipt of final approval of the subsequent and final tranche of the Offering, and the intended use of proceeds from the Offering. Forward-looking statements include predictions, projections and forecasts and are often, but not always, identified by the use of words such as ‘anticipate’, ‘believe’, ‘plan’, ‘estimate’, ‘expect’, ‘potential’, ‘target’, ‘budget’ and ‘intend’ and statements that an event or result ‘may’, ‘will’, ‘should’, ‘could’ or ‘might’ occur or be achieved and other similar expressions and includes the negatives thereof.

Forward-looking statements are based on the reasonable assumptions, estimates, analysis, and opinions of the management of the Company made in light of its experience and its perception of trends, current conditions and expected developments, as well as other factors that management of the Company believes to be relevant and reasonable in the circumstances at the date that such statements are made. Forward-looking information is based on reasonable assumptions that have been made by the Company as at the date of such information and is subject to known and unknown risks, uncertainties and other factors that may have caused actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: risks associated with mineral exploration and development; metal and mineral prices; availability of capital; accuracy of the Company’s projections and estimates; realization of mineral resource estimates, interest and exchange rates; competition; stock price fluctuations; availability of drilling equipment and access; actual results of current exploration activities; government regulation; political or economic developments; environmental risks; insurance risks; capital expenditures; operating or technical difficulties in connection with development activities; personnel relations; and changes in Project parameters as plans continue to be refined. Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to the price of silver, gold and barite; the demand for silver, gold and barite; the ability to carry on exploration and development activities; the timely receipt of any required approvals; the ability to obtain qualified personnel, equipment and services in a timely and cost-efficient manner; the ability to operate in a safe, efficient and effective matter; and the regulatory framework regarding environmental matters, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate and actual results, and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking information contained herein, except in accordance with applicable securities laws. The forward-looking information contained herein is presented for the purpose of assisting investors in understanding the Company’s expected financial and operational performance and the Company’s plans and objectives and may not be appropriate for other purposes. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

News Provided by GlobeNewswire via QuoteMedia

This post appeared first on investingnews.com

Skyharbour Resources Ltd. (TSX-V:SYH)  (OTCQX:SYHBF) (Frankfurt:SC1P) (‘Skyharbour’, ‘SYH’ or the ‘Company’) is pleased to announce plans for a major 2026 exploration campaign spanning several of the newly-formed Russel Lake joint ventures with Denison Mines Corp. (‘Denison’) (TSX:DML) (NYSE American: DNN). Over 15,000 metres of diamond drilling is planned across the Wheeler North, RL, and Getty East joint ventures, each of which were formed following completion of the strategic transaction with Denison in December 2025 that resulted in a reorganization of the former Russell Lake uranium project into four separate property joint ventures (the ‘Russell Lake Joint Ventures’).

Reorganization of the Russell Lake Project:
https://www.skyharbourltd.com/_resources/images/Russell-Map-New.jpg

The Russell Lake Joint Ventures are strategically located in the central portion of the eastern Athabasca Basin of northern Saskatchewan, to the east of Denison’s flagship Wheeler River project, and with access to significant regional infrastructure, including an exploration camp, provincial highways, and the provincial power grid.

Russell Lake Project Area Location Map:
https://www.skyharbourltd.com/_resources/images/SKY_RussellLake.jpg

Highlights of 2026 Exploration Plans:

  • Immediate start to exploration at Denison-operated Wheeler North property with 2,500 metres planned for winter drilling at the Fox Lake Trail target, where previous drilling identified extensive faulting and intense illite- and dravite-dominated alteration, together with elevated uranium and boron geochemistry which confirms the presence of strong uranium-mineralizing hydrothermal systems.
  • Additional 5,000 metres of drilling at the Wheeler North property’s Fork and Sphinx target areas is planned for later in the year, intending to follow up on drilling from the last two years which confirmed prospective structures and/or uranium mineralization.
  • Target generation and diamond drilling follow up planned for Skyharbour-operated RL property expected to consist of ground EM surveys and 4,000-5,000 metres of diamond drilling across several prospective targets.
  • Ground geophysical surveys and approximately 3,600 metres of diamond drilling targeting the Little Mann Lake prospect area and priority targets along the extension of the mineralized Middle Lake Trend on the Getty East property.
  • In total, over 15,000 metres of diamond drilling planned in 2026 across newly reorganized properties at the Russell Lake Joint Ventures.

Jordan Trimble, President and CEO of Skyharbour, stated: ‘2026 is set to be a transformative year for Skyharbour and the upcoming commencement of drilling at the recently formed Russell Lake joint ventures represents a key near-term catalyst. The planned +15,000-metre, multi-phased drill campaign at Russell is a substantial increase to previous annual drilling programs as we accelerate exploration efforts together with our new funding-partner, Denison, using systematic and proven exploration methodologies. We are confident that this collaboration with Denison will expedite the discovery process and leverage Denison’s success in exploring, permitting, and developing the neighboring Wheeler River Project, where the high-grade Phoenix deposit is positioned to become the next new large-scale uranium mine built in the region since the Cigar Lake mine.’

Mr. Trimble continued: ‘The Russell Lake Joint Ventures encompass one of the largest and most prospective land packages in the Athabasca Basin region, with a combination of proximity to existing and developing mines, as well as low-cost drilling and relatively shallow target depths. Combined with our recently announced plans for drilling in 2026 at our adjacent Moore Project, as well as at our Preston Project JV and various other partner-funded projects, the Company will have consistent news flow throughout 2026. With over 30,000 metres of diamond drilling anticipated across Skyharbour’s project portfolio in 2026, we believe the Company offers unique and significant discovery optionality.’

Wheeler North Property Plans:

Wheeler North consists of 16,409 hectares over eight claims that host numerous prospective exploration targets located adjacent to the Wheeler River Project. Ownership is initially 51% Skyharbour and 49% Denison, with Denison serving as the operator and holding additional earn-in options to achieve up to a 70% ownership interest. 

At Wheeler North, Denison is planning an exploration program comprising approximately 13 diamond drill holes totalling approximately 7,500 metres this year. The work is expected to be sole funded by Denison pursuant to its earn-in options, and is set to commence shortly with a focus on three high-priority target areas: Fork, Sphinx, and Fox Lake Trail (‘FLT’).

At the Fork Zone, previous drilling by Skyharbour confirmed the presence of high-grade uranium mineralization, including the high-grade intersection in drill hole RSL24-02, which returned 3.0% U3O8 over 0.5 metres. Drilling in 2025 identified a broad corridor of intense sandstone and basement alteration associated with favourable geochemistry along strike to the north of hole RSL24-02. Drilling planned for 2026 will focus on systematically testing this intense alteration corridor with the objective of expanding the known mineralized footprint at the Fork Target.

To the northwest of the Fork Zone, the Sphinx target area has emerged as a newly identified, high-priority target area, which is located approximately one kilometre from Denison’s Phoenix deposit. Inaugural drilling completed in 2025 intersected a faulted graphitic unit in the basement, confirming the presence of a prospective reactivated structural corridor at Sphinx. The projected unconformity intersection of this structure is considered a priority follow-up target, with additional drilling planned to test this setting along strike.

At the Fox Lake Trail (‘FLT’) Zone, drilling in 2025 by Skyharbour intersected strong hydrothermal alteration associated with uranium-mineralizing systems, including intense sandstone desilicification, brecciation, fracturing, elevated boron values, and widespread illite- and dravite-dominant clay alteration. Notably, drill hole RSL25-03A intersected a strongly altered sandstone fault zone with boron values up to 5,360 ppm, while RSL25-02 intersected anomalous basement-hosted uranium within a faulted graphitic unit, collectively indicating proximity to a fertile uranium-bearing structural corridor. A focused follow-up program of three to four drill holes is planned to commence in winter 2026, with contingency drill targets available on additional untested conductors within the FLT area.

RL Property Plans: 

The RL property covers 53,192 hectares over 16 claims located north and west of Skyharbour’s adjacent Moore Project. Skyharbour owns an 80% interest and is the project operator while Denison owns 20% and has committed to funding its share of the next $10 million in exploration expenditures on the property. 

The property hosts numerous exploration target areas, including Christie Lake, Blue Steel, Taylor Bay, South Russell, and Kowalchuk Lake. Skyharbour is carrying out electromagnetic (‘EM’) surveys to further refine and prioritize targets along prospective structural corridors and underexplored conductors. This work will be followed by targeted diamond drilling of approximately 4,000 to 5,000 metres this year in 10-14 drill holes, designed to test high-priority targets generated from the integration of historical datasets, recent drilling results, and new geophysical interpretations.

Getty East Property Plans:

Getty East consists of one claim covering 3,105 hectares and hosts the Little Mann Lake uranium zone, as well as the interpreted extension of the Middle Lake trend. Skyharbour owns 70% of the property and will initially act as operator.  Denison has an initial 30% ownership interest, and holds additional earn-in options to acquire up to a 70% interest in the project, as well as the right to become the project operator. The work planned for 2026 is expected to be sole funded by Denison pursuant to its earn-in options.

Skyharbour is planning approximately 16.2 line-kilometres of ground MLTDEM surveying to better define priority conductive corridors associated with the interpreted extension of the Middle Lake trend. Historical drilling on this trend, located to the south of the Getty East property, returned high-grade uranium mineralization, including 22.1% U3O8 over 0.9 metres in drill hole ML-30. The geophysical survey is expected to be followed up by approximately 3,600 metres of diamond drilling in about 10 drill holes to test targets generated from the new geophysics and supported by historical drilling results.

Overview of Recent Skyharbour Exploration Programs at Russell:

Skyharbour recently drilled 19 holes totalling 9,844 metres, together with Moving Loop and Fixed Loop Transient Electromagnetic (TEM) surveys completed across multiple priority target areas within the original Russell Lake project area. This exploration focused on advancing several high-priority targets, including the Fork Zone, M-Zone Extension, Fox Lake Trail, and the newly identified Sphinx target area. Denison and Skyharbour plan to follow-up on the findings of the previously exploration at Russell with the 2026 programs.

First Phase of Exploration:

In the first phase, 8 diamond drill holes totalling 4,124 metres, were completed with 6 of these holes drilled at the newly identified Fork Zone to follow up on the high-grade mineralization intersected in previously reported hole RSL24-02. The remaining 2 holes were drilled at the M-Zone Extension, targeting historical ground EM anomalies.

The Fork Zone was discovered in 2024 and is host to the best uranium mineralization intercepted to date at the Russell Lake project. The highlight results included high-grade unconformity-hosted mineralization intercepted in previously reported RSL24-02, which returned 3.0% U3O8 over 0.5 metres within a broader 2.5-metre interval averaging 0.72% U3O8 at a relatively shallow depth of 338.1 metres. Prior to 2024, the Fork Target had seen minimal historical exploration due to the lack of reliable ground geophysical data, primarily caused by interference from the nearby powerline.

Sphinx and Fork Target Areas – Drill Collar Map:
http://www.skyharbourltd.com/_resources/images/Sphinx-and-Fork-Target-Areas-Drill-Collar-Map-0005.jpg

Hole RSL24-12 at the Fork Zone intersected 0.17% U3O8 over 0.5 metres from 337.8 to 338.3 metres at the unconformity. Anomalous As, Ni, Pb, V, Zn, and B were intersected, in addition to weak uranium mineralization from 330.0 metres until the unconformity at 338.3 metres. Basement geochemistry returned anomalous uranium within altered and structurally disrupted graphitic metasediments. RSL24-12 tested for continuity of mineralization encountered in RSL24-02 to the SSW but the optimum target at the unconformity was undershot thereby warranting further drilling here. Holes RSL24-11, -13, -14, -15, and -16 all intersected anomalous pathfinder elements at the Fork Zone associated with the hanging wall of the structure in graphitic basement lithologies, in addition to anomalous uranium ranging from 11.8(partial) to 150(partial) ppm U.

Fork Target Area – Drill Collar Map:
http://www.skyharbourltd.com/_resources/images/Fork-Target-Area-Drill-Collar-Map-0002.jpg

The MZE (‘M-Zone Extension’) target lies on trend from Denison’s Wheeler River Project M-Zone, where historical drilling intersected basement and unconformity-hosted uranium mineralization. More recent drilling by Denison in 2020 at the M-Zone encountered additional uranium mineralization, along with significant faulting, core loss, geochemical anomalies, and radioactivity. The mineralization at M-Zone is hosted by a graphitic thrust fault within a significant magnetic low, which continues onto the Russell Lake property area at the M-Zone Extension target. It is also noted that lineaments (cross structures) associated with Denison’s Phoenix and Gryphon uranium deposits trend onto the Russell Lake property within the M-Zone Extension target area, further enhancing the prospectivity of this target.

Hole RSL24-17 was drilled to follow up on a 2024 hole at the MZE Zone that was lost in structurally disrupted and altered sandstone before reaching its target. RSL24-17 similarly encountered intense structure and alteration in the sandstone and was lost before intersecting the basement. Hole RSL24-18 intersected moderate hydrothermal hematite within the basal sandstone, and strong shearing locally overprinted by well-developed fault breccia and gouge within the basement. Anomalous uranium was intersected within fractured and altered granitic lithologies.

In addition to the drilling above, focused ground geophysical programs were completed over the Fork, Sphinx and Fox Lake Trail targets within the central and northern portions of the Russell Lake project area. The surveys across the Fork–Sphinx areas identified a series of previously unrecognized conductive anomalies, including four sub-parallel conductors at the Fork area, at least one conductive trend at Sphinx, and an additional parallel trend located between the Fork and Sphinx trends, now referred to as the McGowan trend. All of these conductors were virtually untested prior to the work in 2025. At the Fox Lake Trail area, the survey delineated four parallel conductive trends, of which only two had been drill tested prior to 2025, as earlier surveys failed to adequately resolve these features.

Second Phase of Exploration:

The second phase of drilling comprised of 11 drill holes totaling 5,720 metres, targeting the newly identified, high-priority conductors while also expanding on the successful 2024 discovery at the Fork Zone. Fork is now understood to be a northeast–southwest–trending structural corridor that runs sub-parallel to the historical Grayling Zone and remains largely underexplored. The northern strike extension of the Fork Trend, together with multiple parallel conductive trends to the west, remain virtually untested and represent high-priority targets for follow-up drilling.

Of the 11 holes in the second phase, 6 holes totaling 2,397 metres were completed at the Fork Zone. Hole RSL24-12W1 intersected 2.0 metres averaging 0.28% U3O8, including 0.5 metres of 0.68% U3O8 southwest of hole RSL24-02, confirming continuity along and across strike. A four-hole fence (RSL25-05, -08, -09, and -10) drilled approximately 325 metres north of RSL24-02 tested newly defined, parallel EM conductors located approximately 500 metres west of the historical Grayling showing. These conductors were untested prior to Skyharbour’s 2025 drilling. Holes RSL25-05, -08, and -10 intersected intense sandstone-hosted faulting with bleaching, desilicification, core loss, and clay alteration locally including visible dravite. Hole RSL25-09 intersected a graphitic basement fault zone and clay analyses confirmed illite-dominant alteration with local dravite, consistent with fertile uranium systems in the Athabasca Basin. An additional hole, RSL25-06, drilled approximately 330 metres SSW of RSL24-02, intersected granitic basement and did not explain the EM response. Further drilling in the area is required to adequately test this target with plans in 2026 to do so.

The faulting and associated alteration encountered in RSL25-05, -08, -09, and -10 represent the strongest structural and hydrothermal alteration intensity identified at the Fork Zone to date. This alteration system remains unconstrained along strike in both directions and across strike to the west, highlighting significant upside potential which has already produced grades of up to 3% U3O8 at the target area.

Skyharbour also completed a single drill hole, RSL25-07A, to test a newly identified ground EM conductor at the Sphinx target, representing the first drill test of this target. Sphinx is located approximately one kilometre southeast of the Phoenix deposit on the Wheeler River Project. The hole confirmed the EM anomaly as a faulted and altered graphitic pelite unit, intersected approximately 140 metres below the unconformity. The graphitic fault zone shows evidence of post-Athabasca reactivation and is associated with pervasive bleaching, supporting the interpretation of a structurally fertile system.

Geochemical sampling from RSL25-07A returned elevated uranium and associated pathfinder elements within faulted and graphitic intervals. PIMA analysis identified illite-dominant clay alteration in the sandstone and illite–chlorite alteration in the basement, indicating a well-developed hydrothermal system. Together, these results support the interpretation of a reactivated, structurally focused uranium-fertile corridor at Sphinx. With only one drill hole completed to date and the target located proximal to the Phoenix deposit, Sphinx remains a high-priority target for follow-up drilling planned in 2026.

Furthermore, Skyharbour completed 4 drill holes at the Fox Lake Trail area, located at the northern end of the Russell Lake project area. The drilling tested two of the recently defined conductors by the 2025 ground EM survey within a broad conductive corridor that has seen limited historical drilling with sporadic uranium mineralization and favourable hydrothermal alteration.

Fox Lake Trail Target Area – Drill Collar Map:
http://www.skyharbourltd.com/_resources/images/Fox-Lake-Trail-Target-Area-Drill-Collar-Map_rev-0003.jpg

Holes RSL25-02, RSL25-03A, and RSL25-04 tested the strike extension of the same conductive trend, while hole RSL25-01 tested a parallel conductive target to the southeast. The two drill fences are spaced approximately 800 metres apart. Holes RSL25-03A and RSL25-04 encountered the strongest hydrothermal alteration observed at Fox Lake Trail to date, including brecciation and significant quartz dissolution, while hole RSL25-02 intersected anomalous basement-hosted uranium of 250 ppm U over 0.5 metres within a faulted graphitic unit. Clay analysis confirmed illite- and dravite-dominant alteration. These conductive trends remain largely underexplored along strike, with an additional priority target identified through reinterpretation of historical EM data between the two drill fences, supporting continued follow-up exploration at Fox Lake Trail. Drilling will commence shortly at this target area.

Summary of Russell Lake Joint Ventures:

The Russell Lake Joint Ventures encompass a large, advanced-stage uranium exploration land package totalling 73,314 hectares in the eastern Athabasca Basin of northern Saskatchewan. The properties are strategically positioned between Cameco’s Key Lake and McArthur River operations and immediately east of Denison’s Wheeler River Project.

Following the completion of a major strategic transaction with Denison in 2025, the former Russell Lake project was restructured into four separate joint venture uranium properties: RL, Wheeler North, Getty East, and Wheeler River Inliers. Each property is subject to its own joint venture agreement with operatorship divided between the partners. Skyharbour is the operator at the RL Claims and Getty East, and Denison is the operator at Wheeler North and the Wheeler River Inliers. In aggregate, the strategic transaction included total project consideration of up to C$61.5 million with Skyharbour retaining an 80% interest at RL while Denison can earn up-to 70% at each of the other properties.

The Russell Lake Joint Ventures benefit from excellent regional infrastructure, with the northern extension of Highway 914 traversing the western portion of the land package and a high-voltage provincial powerline running parallel to the road. Across the joint ventures, there are numerous high-priority exploration targets including the Grayling, Fork, Little Mann Lake, Christie Lake, Fox Lake Trail, Sphinx, Blue Steel, Taylor Bay, South Russell, and Kowalchuk Zones. In addition, more than 35 kilometres of largely untested prospective electromagnetic conductors occur across the joint venture properties, highlighting the substantial discovery potential.

QA/QC, Radiometric Equivalent Grades and Spectrometer Readings:

All drill intervals above are downhole length and sampling procedures and QA/QC protocols for geochemical results as well as a description of downhole gamma probe grade calculations and protocols are below. All drill core samples are shipped to the Saskatchewan Research Council Geoanalytical Laboratories (SRC) in Saskatoon, Saskatchewan under the care of Skyharbour personnel for preparation, processing, and multi-element analysis by ICP-MS and ICP-OES using total (HF:NHO3:HClO4) and partial digestion (HNO3:HCl), boron by fusion, and U3O8 wt% assay by ICP-OES using higher grade standards. Assay samples are chosen based on downhole probing radiometric equivalent uranium grades and scintillometer (Radiation Solutions RS-125) peaks. Assay sample intervals comprise 0.5 metre continuous half-core split samples over the mineralized interval. These samples may also be selected for density determination using Rock Density by Dry Bulk Method (wax-coated displacement method). With all assay samples, one half of the split sample is retained and the other sent to the SRC for analysis. The SRC is an ISO/IEC 17025/2005 and Standards Council of Canada certified analytical laboratory. Blanks, standard reference materials, and repeats are inserted into the sample stream at regular intervals by Skyharbour and the SRC in accordance with Skyharbour’s quality assurance/quality control (QA/QC) procedures. Geochemical assay data are subject to verification procedures by qualified persons employed by Skyharbour prior to disclosure.

During active exploration programs, drillholes are radiometrically logged using calibrated downhole Mount Sopris HLP-2375 or 2GHF probes of varying sensitivities, which collect continuous readings along the length of the drillhole. Preliminary radiometric equivalent uranium grades (‘eU3O8‘) are then calculated from the downhole radiometric results. The probe is calibrated using an algorithm calculated from the calibration of the probe at the Saskatchewan Research Council facility in Saskatoon and from the comparison of probe results against geochemical analyses. In the case where core recovery within a mineralized intersection is poor or non-existent, radiometric grades are considered to be more representative of the mineralized intersection and may be reported in the place of assay grades. Radiometric equivalent probe results are subject to verification procedures by qualified persons employed by Skyharbour prior to disclosure. 

Qualified Person:

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed and approved by Serdar Donmez, P.Geo., VP of Exploration for Skyharbour, as well as a Qualified Person.

About Skyharbour Resources Ltd.:

Skyharbour holds an extensive portfolio of uranium exploration projects in Canada’s Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals with interest in forty-three projects covering over 662,887 hectares (over 1.6 million acres) of land. Skyharbour owns a 100% interest in the Moore Uranium Project, which is located 15 kilometres east of Denison’s Wheeler River project and 39 kilometres south of Cameco’s McArthur River uranium mine. Moore is an advanced-stage, uranium exploration property with high-grade, shallow uranium mineralization at the Maverick Zones. Adjacent to Moore, Skyharbour is advancing several uranium properties within the Russell Lake project area with its joint venture partner and large strategic shareholder Denison Mines. Collectively these projects host multiple zones of high-grade uranium mineralization across a highly prospective land package with significant exploration upside, and the Company is actively working these assets through exploration and drilling programs.

Skyharbour now has joint ventures with industry-leaders Denison Mines and Orano Canada Inc. at the Russell Lake properties and the Preston project, respectively. The Company also has several active earn-in option partners, including CSE-listed Nexus Uranium Corp. at the Mann Lake Uranium Project; TSX-V listed North Shore Uranium at the Falcon Project; UraEx Resources at the South Dufferin and Bolt Projects; Hatchet Uranium at the Highway Project; CSE-listed Mustang Energy at the 914W Project; and TSX-V listed Terra Clean Energy at the South Falcon East Project. In aggregate, Skyharbour has now signed earn-in option agreements with partners that total to potentially over $76 million in partner-funded exploration expenditures and over $42 million in cash and share payments coming into Skyharbour, assuming that these partner companies complete the earn-ins at their respective projects.

Skyharbour’s goal is to maximize shareholder value through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions.

Skyharbour’s Uranium Project Map in the Athabasca Basin:
https://www.skyharbourltd.com/_resources/images/SKY_SaskProject_Locator_2025-12-16.jpg

To find out more about Skyharbour Resources Ltd. (TSX-V: SYH) visit the Company’s website at www.skyharbourltd.com.

Skyharbour Resources Ltd.

‘Jordan Trimble’

Jordan Trimble
President and CEO

For further information contact myself or:

Nicholas Coltura
Corporate Communications Manager
Skyharbour Resources Ltd.
Telephone: 604-558-5847
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@skyharbourltd.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

Forward-Looking Information:

This news release contains ‘forward‐looking information or statements’ within the meaning of applicable securities laws, which may include, without limitation, completing ongoing and planned work on its projects including drilling and the expected timing of such work programs, other statements relating to the technical, financial and business prospects of the Company, its projects and other matters. All statements in this news release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of uranium, the ability to achieve its goals, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms. Such forward-looking information reflects the Company’s views with respect to future events and is subject to risks, uncertainties and assumptions, including the risks and uncertainties relating to the interpretation of exploration results, risks related to the inherent uncertainty of exploration and cost estimates and the potential for unexpected costs and expenses, and those filed under the Company’s profile on SEDAR+ at www.sedarplus.ca. Factors that could cause actual results to differ materially from those in forward looking statements include, but are not limited to, continued availability of capital and financing and general economic, market or business conditions, adverse weather or climate conditions, failure to obtain or maintain all necessary government permits, approvals and authorizations, failure to obtain or maintain community acceptance (including First Nations), decrease in the price of uranium and other metals, increase in costs, litigation, and failure of counterparties to perform their contractual obligations. The Company does not undertake to update forward‐looking statements or forward‐looking information, except as required by law.

News Provided by GlobeNewswire via QuoteMedia

This post appeared first on investingnews.com

European Lithium Ltd (ASX: EUR, FRA: PF8, OTC: EULIF) (“European Lithium” or the “Company”) advises that it has completed a sale of 5 million ordinary shares in Critical Metals Corp. (NASDAQ: CRML). BMO Capital Markets Corp. helped facilitate the transaction by acting in a market maker capacity pursuant to the affiliate provisions of Rule 144.

The transaction will generate net proceeds of approximately A$124 million to EUR, therefore increasing the Company’s cash reserves to A$322m.

Following the transaction EUR will still hold 48,036,338 ordinary shares in CRML. Based on the closing share price of CRML (being US$17.17 per share as of 20 January 2026), the Company’s current investment is valued at US$824,783,923 (A$1,228,928,046) noting that this valuation is subject to fluctuation in the daily share price movement of CRML.

Tony Sage, Executive Chairman of European Lithium, commented “This transaction again proves our investment in the Tanbreez project has been a huge success and hopefully the EUR share price should finally reflect its true asset value. The sale will also provide EUR with additional financial flexibility while maintaining a significant exposure to CRML. The proceeds will further strengthen our balance sheet and positions the Company to continue advancing its core projects, look for new opportunities or return capital to shareholders.”

About European Lithium

European Lithium Limited is an exploration and development stage mining company focused on lithium assets in Austria, Ukraine, and Ireland. It also has significant holdings in CUFE Ltd ( copper/ gold / bismuth) in the Northern Territory, MOAB (uranium in Tanzania), Cyclone Metals Ltd ( Iron Bear Project in Canada) and a direct 7.5% stake in the Tanbreez rare earth project in Greenland.

For more information, please visit https://europeanlithium.com.

About Critical Metals Corp.

Critical Metals Corp (Nasdaq: CRML) is a leading mining development company focused on critical metals and minerals, and producing strategic products essential to electrification and next-generation technologies for Europe and its Western world partners. Its flagship Project, Tanbreez, is one of the world’s largest, rare- earth deposits and is located in Southern Greenland. The deposit is expected to have access to key transportation outlets as the area features year-round direct shipping access via deep water fjords that lead directly to the North Atlantic Ocean.

Another key asset is the Wolfsberg Lithium Project located in Carinthia, 270 km south of Vienna, Austria. The Wolfsberg Lithium Project is the first fully permitted mine in Europe and is strategically located with access to established road and rail infrastructure and is expected to be the next major producer of key lithium products to support the European market. Wolfsberg is well positioned with offtake and downstream partners to become a unique and valuable asset in an expanding geostrategic critical metals portfolio. With this strategic asset portfolio, Critical Metals Corp is positioned to become a reliable and sustainable supplier of critical minerals essential for defense applications, the clean energy transition, and next-generation technologies in the western world.

For more information, please visit https://criticalmetalscorp.com/.

Click here for the full ASX Release

This post appeared first on investingnews.com

Bayan Mining and Minerals Ltd (ASX: BMM; ‘BMM’ or ‘the Company’) is pleased to report significant high-grade rare earth element (REE) results from follow- up surface geochemical sampling at its 100% owned Desert Star Project, located in San Bernardino County, California, USA.

Highlights

  • Substantial Increase in Surface REE Grades: Follow-up surface sampling returned materially higher total rare earth oxide (TREO) grades than the reported in Phase 1 reconnaissance program. The stand out results up to:
Surface Samples

  • 66,810 ppm TREO (Sample 19583)
  • 6,220 ppm TREO (Sample 19593)
  • 5,458 ppm TREO (Sample 19594)
  • 4,979 ppm TREO (Sample 19544)
  • 4,551 ppm TREO (Sample 19569)
Heavy Minerals Concentrate Samples

  • 91,092 ppm TREO (Sample 19597)
  • 34,330 ppm TREO (Sample 19598)
  • 8,793 ppm TREO (Sample 19509)
  • 6,632 ppm TREO (Sample 19513)
  • 2,796 ppm TREO (Sample 19511)
  • Multi-Media Confirmation of Mineralisation: Elevated TREO across both surface and heavy mineral concentrate samples confirm a robust primary REE source with effective secondary dispersion into local drainage systems.
  • Favourable Geological Controls: Sampling targeted structurally controlled, oxidised pegmatitic and gneissic lithologies with carbonate veining, brecciation and Fe-oxide alteration, consistent with REE-hosting systems recognised within the Mountain Pass district.
  • High Priority Targets Defined: Integrated desktop and geophysical studies have already delineated four coherent high-priority REE targets, supported by geophysics and geochemical signatures consistent with carbonatite-hosted systems.
  • Approved Plan of Operation: The U.S. Bureau of Land Management (BLM) has approved the Plan of Operations (PoO) for the Desert Star Project, providing regulatory clearance to advance field activities and progress toward drilling.
  • Strong Phase 1 Results Provide Foundation: Initial reconnaissance sampling returned outstanding results, including: 7,841 ppm TREO (Sample ID 19415), 4,097 ppm TREO (Sample 19378), 3,443 ppm TREO (Sample 19411), 3,443 ppm TREO (Sample 19413), 2,986 ppm TREO (Sample 19366) and 2,828 ppm TREO (Sample 19355) at the Desert Star Project (see ASX Announcement dated 1 September 2025).
  • Strategic Location of Desert Star Projects:Bayan’s Desert Star Project is strategically located just 4.5 km northeast of MP Materials’ Mountain Pass REEMine1 one of the largestand highest-grade rare earth operations globally. Desert Star North Projectlies only 3 km north of the Dateline Resources’ Colosseum Gold Mine2.Both properties are located within the same regional corridor and sharestructural and geological characteristics with the globally significantMountain Pass REE Mine.

The Phase 2 surface sampling program was designed to infill and extend anomalous areas identified during the Phase 1 initial reconnaissance campaign and to test priority structural corridors defined from earlier surface sampling and geophysical datasets. The results demonstrate a clear increase in grade tenor relative to Phase 1 and further validated Desert Star as a prospective REE zones system located within one of the world’s premier rare earth district.

A total of 73 rock chip samples and 56 heavy mineral concentrate samples were collected during the phase 2 program. Assay results demonstrate a clear increase in grade tenor relative to Phase 1 results, with values returning up to 66,816 ppm TREO (6.6%) from rock chip samples and up to 91,101 ppm TREO (9.1%) from heavy mineral concentrate samples.

Click here for the full ASX Release

This post appeared first on investingnews.com

Eric Nuttall, partner and senior portfolio manager at Ninepoint Partners, shares his outlook for oil and natural gas in 2026, emphasizing that he remains bullish on both.

However, he’s looking at different timelines — he sees natural gas as a more immediate story, while oil is likely to pick up in the second half of the year.

Securities Disclosure: I, Charlotte McLeod, hold no direct investment interest in any company mentioned in this article.

This post appeared first on investingnews.com

TSX-V: WLR
Frankfurt: 6YL

Standards of Disclosure for Mineral Projects and its Companion Policy 43-101CP with an effective date of January 6, 2026.

The report was co-authored by Ronacher McKenzie Geosciences Inc. who conducted a site visit in 2025 to verify work completed since the 2021 season that has been reported by WLR which included a drill program in 2022, a minor sampling program on the Silver Hart claims in 2024, completion of a trenching program and minor reconnaissance efforts on the adjoining and acquired Blue Heaven claims in 2024, and reclamation programs on all of the claims in 2023 and 2024.

Subject to financing WLR intends to conduct drilling, socio-economic, environmental and engineering studies and initiate a Preliminary Economic Assessment of the Silver Hart Project in 2026.

The CIM Standards require that an estimated mineral resource must have reasonable prospects for eventual economic extraction. A summary of the SHP mineral resource economic and technical parameters and/or assumptions is presented in Table 1 below. A pit-shell was optimized based on silver equivalent values calculated using the economic parameters in the table.

Table 1: Summary of the Siver Hart Project Economic and Technical Parameters/Assumptions

Item

Units

Extended

Mining cost

CAD$/t all material

10.00

Processing cost

CAD$/t crude feed

25.50

G&A cost

CAD$/t crude feed

5.00

Exchange rate

CAD$ to US$

0.75

Ag price

USD$/oz

23.30

Pb price

US$/metric tonne

1,892

Zn price

US$/metric tonne

2,505

Metallurgical recovery

Percentage

80

Overall pit slope

Degrees

45

Silver Equivalent Calculation:  AgEq g/t = [(Ag ppm x %Rec. x Price/g) + (Pb ppm x %Rec. x Price/g) + (Zn ppm x %Rec. x Price/g)]/ (Ag Price/g x %Rec).
Note: Rec. = metallurgical recovery. AgEq=Silver Equivalent.

Block grade interpolation was performed using the ordinary kriging (OK) technique. The estimated pit constrained mineral resources were classified as Inferred, despite some close drill hole spacing in some zones and the continuity of mineralization as confirmed by variography, mainly because of the lack of substantiated metal recoveries and suspect collar surveys. Table 2 summarizes the update MRE fpr the Silver Hart Project effective as at January 6, 2026.

Table 2: Silver Hart Project – Pit Constrained Mineral Resources at a Cut-off Grade of AgEq>=50 g/t 

Mining Method

Domain

Mass (Tonnes)

Average Value

Material Content

AgEq g/t

Ag g/t

Pb %

Zn %

AgEq

Million oz

Ag Million oz

Pb

Million lb

Zn

Million lb

Open

Pit

TM_Zone

269,000

229.8

152.7

0.56

1.88

1.985

1.319

3.3

11.1

S_Zone

127,000

334.5

262.1

0.36

1.90

1.368

1.072

1.0

5.3

KL_Zone

1,026,000

110.9

35.7

0.11

2.17

3.659

1.178

2.5

49.0

K_Zone

265,000

79.8

14.2

0.09

1.90

0.680

0.121

0.5

11.1

M_Zone

202,000

173.6

98.1

0.58

1.82

1.128

0.637

2.6

8.1

Total

1,889,000

145.2

71.3

0.24

2.03

8.820

4.327

9.9

84.7

Notes:

1.

The effective date of this mineral resource statement is January 6, 2026.

2.

The qualified person responsible for this Mineral Resource Estimate (MRE) is Charley Murahwi, M.Sc., P.Geo., FAusIMM.

3.

The mineral resources have been estimated in accordance with the CIM Best Practice Guidelines (2019) and the CIM Definition Standards (2014)

4.

Ordinary Kriging (OK) interpolation was used with a single block size of 5m x 5m x 5m.

5.

The Economic & Technical parameters/assumptions are summarized in Table 1.1 above.

6.

The mineral resource results are presented in-situ within the optimized pit. Mineralized material outside the pit has not been considered as a part of the current MRE.

7.

The tonnes and metal contents are rounded to reflect that the numbers are an estimate and any discrepancies in the totals are due to the rounding effects.

8.

Mineral resources unlike mineral reserves do not have demonstrated economic viability.

The report also noted that:

  • All the deposits remain open along strike in both directions and down dip, and, in particular, the largest deposit (KL zone). The likelihood of some of the deposits merging (i.e., K to KL, TM main to H and S to M) cannot be ruled out if a program of step out and infill drilling is implemented.
  • The growth potential for the mineral resource is satisfactory as the deposits remain open for expansion in all directions (i.e., strike in both directions and down dip).
  • Prospects for growing the resource via new discoveries appear favorable based on the fact that several known mineral occurrences and anomalies within the Silver Hart and the adjacent Blue Heaven claims remain to be test drilled for resource evaluation.
  • The early initial metallurgical tests completed previously in 1986 and, in 2006, do not have substantiated documentation regarding representativity and location of the samples and, thus, the need for a fresh start is warranted. Nonetheless, the general response of lead, zinc and silver to flotation in those early tests was generally positive.

The NI-43-101 MRE report has been filed on its SEDAR+ profile and will soon be published on the Company’s website at www.walkerlaneresources.com

Kevin Brewer, President and CEO of WLR, commented ‘The MRE is a major milestone in our exploration efforts at Silver Hart. The MRE was estimated at prices much lower than current spot metal prices, which if used in the silver equivalent calculation in the MRE calculation result in an improved silver equivalent grade. You can do the math. As a result, WLR now intends to advance our evaluation of this project to consider a production decision in the short term. Mineralization in all of the zones in the Silver Hart Project start at surface and therefore are expected to be amenable to small scale open pit mining. WLR and its predecessor company CMC Metals Ltd. have been working on this project for 20 years and it is now prepped to take the project to the next stage.’

Next Steps – Highlights of Proposed 2026 Exploration Program and Preparation of a Preliminary Economic Assessment

Walker Lane Resources Ltd. also announced that it is preparing to commence planning for the next stage of its exploration program and evaluation of the Silver Hart Project which will contribute to a potential development decision for the project.

Subject to financing, WLR intends to:

  • Complete 1,500-2,000 meters of exploration drilling to (i) extend the resources on the TM Zone (ii) to conduct infill drilling in the TM Zone with the objective of converting a majority of the inferred resources to indicated resources.
  • Conduct 1,000-1,500 meters of exploratory drilling on known areas of mineralization on the Blue Heaven claims.
  • Metallurgical testing including pre-concentration (ore sorting / dense heavy media separation) assessments.
  • Conduct additional environmental and socio-economic studies to support a possible development application for the project. This is expected to include examining opportunities for partnerships with local First Nations.
  • Initiate a Preliminary Economic Assessment of the project which will include preliminary engineering and a preliminary transportation/logistics analysis.

Qualified Persons

The resource evaluation work was completed by Mr. Charley Murahwi, M.Sc. P.Geo., FAusIMM and Richard Gowans, B.Sc, P.Eng of MICON International Limited. Mr. Murahwi conducted a personal inspection of the Silver Hart Project on August 17-20, 2021. Dr. Gloria Lopez, PhD, P.Geo. of Ronacher-McKenzie Geosciences Inc. was a contributing author and conducted a personal inspection of the Silver Hart Project on September 16, 2025. This information release has also been reviewed and approved by the Qualified Persons.

About Walker Lane Resources Ltd.

Walker Lane Resources Ltd. is a growth-stage exploration company focused on the exploration of high-grade gold, silver and polymetallic deposits in the Walker Lane Gold Trend District in Nevada and the Rancheria Silver District in Yukon/B.C. and other property assets in Yukon. The Company intends to initiate an aggressive exploration program to advance the Tule Canyon (Walker Lane, Nevada) and Amy (Rancheria Silver District, B.C.) projects through drilling programs with the aim of achieving resource definition in the near future.

For more information, please consult the Company’s filings, available at www.sedarplus.ca. Also please feel free to call Kevin at the number below.

ON BEHALF OF THE BOARD OF DIRECTORS

Kevin Brewer
CEO and Director
Walker Lane Resources Ltd.

Cautionary and Forward Looking Statements

This press release and related figures and/or tables, contain certain forward-looking information and forward-looking statements as defined in applicable securities laws (collectively referred to as forward-looking statements). These statements relate to future events or our future performance. All statements other than statements of historical fact are forward-looking statements. The use of any of the words ‘anticipate’, ‘plans’, ‘continue’, ‘estimate’, ‘expect’, ‘may’, ‘will’, ‘project’, ‘predict’, ‘potential’, ‘should’, ‘believe’ ‘targeted’, ‘can’, ‘anticipates’, ‘intends’, ‘likely’, ‘should’, ‘could’  or grammatical variations thereof and similar expressions is intended to identify forward-looking statements. These statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements. These statements speak only as of the date of this presentation. These forward-looking statements include, but are not limited to, statements concerning: our strategy and priorities including certain statements included in this presentation are forward-looking statements within the meaning of Canadian securities laws, including statements regarding the Tule Canyon, Cambridge, Silver Mountain, and Shamrock Properties in Nevada (USA), and its properties including Silverknife and Amy properties in British Columbia, the  Silver Hart, Blue Heaven and Logjam properties in Yukon all of which now comprise the mineral property assets of WLR. WLR has assumed other assets of CMC Metals Ltd. including common share holdings of North Bay Resources Inc. (OTC-US: NBRI) and all conditions and agreements pertaining to the sale of the Bishop mill gold processing facility and remain subject to the condition of the option of the Silverknife property with Coeur Mining Inc. (TSX:CDE). These forward-looking statements reflect the Company’s current beliefs and are based on information currently available to the Company and assumptions the Company believes are reasonable. The Company has made various assumptions, including, among others, that: the historical information related to the Company’s properties is reliable; the Company’s operations are not disrupted or delayed by unusual geological or technical problems; the Company has the ability to explore the Company’s properties; the Company will be able to raise any necessary additional capital on reasonable terms to execute its business plan; the Company’s current corporate activities will proceed as expected; general business and economic conditions will not change in a material adverse manner; and budgeted costs and expenditures are and will continue to be accurate.

Actual results and developments may differ materially from results and developments discussed in the forward-looking statements as they are subject to a number of significant risks and uncertainties, including: public health threats; fluctuations in metals prices, price of consumed commodities and currency markets; future profitability of mining operations; access to personnel; results of exploration and development activities, accuracy of technical information; risks related to ownership of properties; risks related to mining operations; risks related to mineral resource figures being estimates based on interpretations and assumptions which may result in less mineral production under actual conditions than is currently anticipated; the interpretation of drilling results and other geological data; receipt, maintenance and security of permits and mineral property titles; environmental and other regulatory risks; changes in operating expenses; changes in general market and industry conditions; changes in legal or regulatory requirements; other risk factors set out in this presentation; and other risk factors set out in the Company’s public disclosure documents. Although the Company has attempted to identify significant risks and uncertainties that could cause actual results to differ materially, there may be other risks that cause results not to be as anticipated, estimated or intended. Certain of these risks and uncertainties are beyond the Company’s control. Consequently, all of the forward-looking statements are qualified by these cautionary statements, and there can be no assurances that the actual results or developments will be realized or, even if substantially realized, that they will have the expected consequences or benefits to, or effect on, the Company.

The information contained in this presentation is derived from management of the Company and otherwise from publicly available information and does not purport to contain all of the information that an investor may desire to have in evaluating the Company. The information has not been independently verified, may prove to be imprecise, and is subject to material updating, revision and further amendment. While management is not aware of any misstatements regarding any industry data presented herein, no representation or warranty, express or implied, is made or given by or on behalf of the Company as to the accuracy, completeness or fairness of the information or opinions contained in this presentation and no responsibility or liability is accepted by any person for such information or opinions. The forward-looking statements and information in this presentation speak only as of the date of this presentation and the Company assumes no obligation to update or revise such information to reflect new events or circumstances, except as may be required by applicable law. Although the Company believes that the expectations reflected in the forward-looking statements and information are reasonable, there can be no assurance that such expectations will prove to be correct. Because of the risks, uncertainties and assumptions contained herein, prospective investors should not read forward-looking information as guarantees of future performance or results and should not place undue reliance on forward-looking information. Nothing in this presentation is, or should be relied upon as, a promise or representation as to the future. To the extent any forward-looking statement in this presentation constitutes ‘future-oriented financial information’ or ‘financial outlooks’ within the meaning of applicable Canadian securities laws, such information is being provided to demonstrate the anticipated market penetration and the reader is cautioned that this information may not be appropriate for any other purpose and the reader should not place undue reliance on such future-oriented financial information and financial outlooks. Future-oriented financial information and financial outlooks, as with forward-looking statements generally, are, without limitation, based on the assumptions and subject to the risks set out above. The Company’s actual financial position and results of operations may differ materially from management’s current expectations and, as a result, the Company’s revenue and expenses. The Company’s financial projections were not prepared with a view toward compliance with published guidelines of International Financial Reporting Standards and have not been examined, reviewed or compiled by the Company’s accountants or auditors. The Company’s financial projections represent management’s estimates as of the dates indicated thereon.

SOURCE Walker Lane Resources Ltd

View original content to download multimedia: http://www.newswire.ca/en/releases/archive/January2026/21/c0060.html

News Provided by Canada Newswire via QuoteMedia

This post appeared first on investingnews.com

Trading in the securities of Cyprium Metals Limited (‘CYM’) will be halted at the request of CYM, pending the release of an announcement by CYM.

Unless ASX decides otherwise, the securities will remain in trading halt until the earlier of:

  • the commencement of normal trading on Friday, 23 January 2026; or
  • the release of the announcement to the market.

CYM’s request for a trading halt is attached below for the information of the market.

Issued by
ASX Compliance

Click here for the full ASX Release

This post appeared first on investingnews.com

Jindalee Lithium Limited (Jindalee, or the Company; ASX: JLL, OTCQX: JNDAF) is pleased to report assay results from the drilling program at the McDermitt Lithium Project completed late 2025.

  • All holes returned strong lithium and magnesium intercepts from shallow depths, including:
    • R92: 36.5m @ 1951 ppm Li & 5.23% Mg from 24.5m
    • R93: 15.5m @ 1456 ppm Li & 5.45% Mg from 3.6m
    • R94: 66.0m @ 1599 ppm Li & 4.12% Mg from 0.4m
    • R95: 110.6m @ 1519 ppm Li & 4.80% Mg from 23.0m
    • R96: 20.1m @ 1514 ppm Li & 5.29% Mg from 0.4m
  • Three holes twinning earlier RC holes confirmed good correlation with RC results
  • High-quality core samples retained for metallurgical testwork (lithium and magnesium)

Background

On 3 December 2025 Jindalee announced the completion of a large diameter core drilling program at the Company’s 100% owned McDermitt Lithium Project1 (McDermitt, Project), one of the largest lithium deposits in the United States (US) and of global significance2 (Figure 1).

The program comprised five PQ3 (8.5cm diameter) core holes designed to obtain samples for metallurgical testwork to further optimise lithium recoveries, as well as unlock value from the significant magnesium endowment at McDermitt, via the value optimisation program announced late October 20253. The drilling also provided valuable geological and geotechnical data on the deposit, with three of the holes collared to twin reverse circulation (RC) holes drilled in 2021 and 20224.

Discussion

All five holes returned strong lithium and magnesium intercepts from shallow depths as summarised above and in Annexure A. Three holes (R94, R95 and R96) were collared to twin RC holes drilled previously by Jindalee (MDRC-24, MDRC-21 and MDRC-22 respectively), with assays from the recent core holes showing good correlation with the RC results (refer Table 1). Jindalee will now undertake detailed geostatistical analysis to further evaluate the relationship between the results from RC and core drilling to help determine the optimal drilling methods for future programs.

Click here for the full ASX Release

This post appeared first on investingnews.com

Astral Resources NL (ASX: AAR) (Astral or the Company) is pleased to report assay results received from a 17-hole reverse circulation (RC) drill program for 2,954 metres completed at the Kamperman Deposit, part of its 100%-owned Feysville Gold Project (Feysville), located ~14km south of Kalgoorlie in Western Australia (Figure 1).

HIGHLIGHTS

Feysville Project

  • Assay results received for 17 RC holes (2,954m) drilled recently at Kamperman, part of the 100%-owned Feysville Gold Project in WA. The program tested a variety of targets designed both to increase the Mineral Resource and improve understanding of the deposit, with a specific focus on high-grade zones. Best results include:
    • 14m at 6.79g/t Au from 192m including 2m at 23.8g/t Au from 193m (FRC463)
    • 13m at 6.60g/t Au from 44m including 1m at 57.6g/t Au from 46m and 1m at 10.9g/t Au from 48m, 4m at 2.06g/t Au from 62m and 4m at 3.81g/t Au from 88m (FRC457)
    • 21m at 3.11g/t Au from 115m including 1m at 13.4g/t Au from 132m (FRC460)
    • 15m at 3.70g/t Au from 123m including 1m at 16.4g/t Au from 124m and 1m at 21.1g/t Au from 135m, 6m at 2.79g/t Au from 158m, 23m at 2.57g/t Au from 180m including 3m at 13.7g/t Au from 197m and 3m at 2.57g/t Au from 208m (FRC452)
    • 14m at 2.66g/t Au from 179m (FRC461)
    • 27m at 0.78g/t Au from 21m and 25m at 1.68g/t Au from 50m including 1m at 11.7g/t Au from 59m and 1m at 10.5g/t Au from 62m (FRC453)
    • 6m at 4.10g/t Au from 210m including 1m at 13.4g/t Au from 212m (FRC454)
  • The drill program has confirmed the presence of north-west striking high-grade gold mineralisation that is not currently included in the Kamperman Mineral Resource model, as well as confirming depth extensions to the southern lode and additional high-grade mineralisation in the footwall of the southern lode.
Mandilla Project
  • A 4-hole (1,641m) DD program has been completed on the eastern flank of the Theia deposit, part of the 100%-owned Mandilla Gold Project. The drill program was designed to test for a potential steeply dipping sub-parallel mineralised structure to the east of Theia. Best results include:
    • 4.15m at 33.2g/t Au from 164.3m including 0.5m at 269.6g/t Au from 165m, 12.13m at 1.29g/t Au from 173.87m including 0.3m at 23.4g/t Au from 173.87m and 1.79m at 6.21g/t Au from 253.47m including 0.58m at 17.6g/t Au from 253.82m (AMRCD140)
    • 0.3m at 30.7g/t Au from 336.26m (AMRCD139)
  • Quartz, pyrite and visible gold1 were intersected in each of the four holes, confirming the potential for Theia to host additional mineralised structures.
  • A 3-hole (775.6-m) DD program was also completed at Theia. The program was designed to target a previously intersected “230 Shear” structure. Drilling successfully intersected this distinct, narrow high-grade shear zone with best results including:
    • 1.57m at 22.8g/t Au from 168.59m including 0.6m at 59.2g/t Au from 169.56m, 7.12m at 1.42g/t Au from 175.08m including 0.3m at 25.9g/t Au from 175.51m, 8.73m at 0.95g/t Au from 222.44m and 4.90m at 1.28g/t Au from 259m including 0.3m at 13.7g/t Au from 262.07m (AMRCD137)
    • 2.27m at 4.94g/t Au from 161m including 0.47m at 22.8g/t Au from 161.93m and 5.33m at 1.08g/t Au from 202.85m (AMRCD138)

Astral Resources’ Managing Director Marc Ducler said: “The assay results from the recent RC program at Feysville have demonstrated the excellent potential for both the overall gold grade and the deposit size at Kamperman to increase.

“The program was highly successful in achieving its aims to extend interpreted high-grade gold zones beyond the existing Mineral Resource.

“The centrally located drill-hole, FRC457, returned an outstanding intercept of 13m at 6.60g/t Au, representing a very successful extension to a north-west striking high-grade ore shoot which appears to be projecting beyond the current deposit limits.

“Drill-hole FRC463 also returned a spectacular high-grade intercept. Drilled south and well beyond the current Resource testing for a south-plunging ore zone at depth, drilling successfully intersected 14m at 6.79g/t Au from 192m, to confirm one of our deepest zones of high-grade gold mineralisation so far and providing us with a hint of the greater potential still remaining at Kamperman.

“Over the Christmas period, Astral received notice from the DMPE of the grant of our Mining Licence application over areas of Feysville. This marks an important step as we progress towards submission of the Mining Proposal and execution of a JV agreement with Mineral Mining Services for the development of the Think Big Gold Mine. This would establish an early revenue opportunity for Astral against the backdrop of record gold prices to assist with securing overall development funding for the Mandilla Gold Project.

“Meanwhile at the cornerstone Theia deposit at Mandilla, we received assay results from two diamond drill programs, with further outstanding high-grade intercepts recorded.

“The first, a 3-hole program targeting the “230 Shear”, returned results such as 1.57m at 22.7g/t Au and 2.27m at 4.94g/t Au in separate holes, confirming the presence of this discrete, narrow, high-grade shear zone which strikes through the main Theia deposit.

“Importantly the shear, intersected in all three holes, remains mineralised at depth, with the potential to delineate additional sub-parallel repeats both within and extensional to Theia.

“A second 4-hole diamond drill program tested a potential steeply dipping sub-parallel structure to the east of Theia. As an initial positive sign visible gold was logged in all four holes, with a best result including a very high-grade intersection of 4.15m at 33.2g/t Au from 164.3m in hole AMDRCD137.

“Following our successful capital raise completed in December, Astral has funds on hand to maintain an aggressive exploration focus and complete the Mandilla DFS targeting a Final Investment Decision – all while maintaining a significant component of the equity requirement for development of the Mandilla Gold Project.

“Astral has ramped up exploration activities for 2026 with three drill rigs (2 RC and 1 DD rig) currently operating on site.”

Click here for the full ASX Release

This post appeared first on investingnews.com